JET FUEL & CHILLED WATER NETWORKS

At the New Kigali International Airport (NKIA) we are the civil subcontractor for the installation of 5 kilometers of jet fuel hydrant lines and associated valve chambers, delivering deep trenching, pipeline bedding, backfill, and concrete works to meet stringent aviation and safety standards; our scope must ensure precise alignment, corrosion protection measures, and secure access for maintenance while coordinating closely with fuel system MEP engineers to integrate pipe supports and valve chamber layouts.

In parallel, we installed the chilled water network, executing ducting, pipework supports, and concrete encasement

where required to provide reliable thermal distribution for the system. Both works are ongoing amid rigorous quality and compliance requirements, contributing to NKIA’s operational readiness and long-term infrastructure resilience.

Previous
Previous

Fermenting & Horap Tanks at Gisenyi Brewery